• Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS
Mittwoch, November 4, 2026
  • Login
TouristikPresse
  • Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS
No Result
View All Result
  • Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS
No Result
View All Result
TouristikPresse
No Result
View All Result
  • Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS
Home News Business-Technik

Boeing Achieves 787 Power On

Red.4 by Red.4
23. Juni 2008
in Business-Technik, Luftverkehr, Nordamerika & USA
0
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

The Boeing Company has completed the Power On sequence for the first 787 Dreamliner, marking the completion of the next major milestone on the path to first flight later this year.

Everett – Power On is a complex series of tasks and tests that bring electrical power onto the airplane and begin to exercise the use of the electrical systems. The 787 is a more-electric airplane with the pneumatic, or bleed air, system being totally replaced by electronics.

„The team has made great progress in bringing the bold innovation of the 787 to reality,“ said Pat Shanahan, vice president and general manager of the 787 program. „There is plenty of work to be done between now and first flight, but with every step forward we grow more and more confident.“

The Power On sequence began in early June with a series of pretest continuity checks to verify that the wiring installed in the airplane had been connected properly. Upon completion of those checks, the Boeing team plugged in an external power cart and slowly began to bring full power into each segment of the system, beginning with the flight deck displays. From that point forward, the pilot’s controls were used to direct the addition of new systems to the power grid.

At each step of the testing, power is allowed to flow into one additional area and gauges are used to verify that the right level of electrical power reached the intended area. „We are very methodical in ensuring the integrity of the airplane’s systems,“ said Shanahan. „In completing the Power On sequence, we have verified both that the electrical power distribution system is installed as designed and that it functions as intended.“

An inside look at the Power On testing sequence will be featured on boeing.com and newairplane.com beginning Monday at 5 a.m. PDT.

Work will continue to finish building the first 787 and further test its readiness for operations. First flight is expected in the fourth quarter.

The Boeing 787 Dreamliner is a more fuel-efficient mid-sized jetliner capable of serving on long-distance routes. The 787 is expected to enter revenue service in 2009 after an extensive flight test program.

Fifty-eight customers around the world have ordered nearly 900 787s since the program was launched in April 2004, making the Dreamliner the fastest-selling new commercial jetliner in history.

Photo: Boeing

Tags: 787BoeingDreamlinerPower On
Previous Post

Weltausstellung 2008 in Zaragoza eröffnet

Next Post

Air Mauritius mit hervorragendem Ergebnis

Next Post

Air Mauritius mit hervorragendem Ergebnis

Schreibe einen Kommentar Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

  • Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS
  • Kontakt
  • AGB
  • Datenschutz
  • Cookie-Richtlinie (EU)
  • Impressum/Imprint

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Nachrichten
  • Meldungs-Archiv
  • Bilder
  • NewsAPI
  • Pressemeldung einsetzen
  • Reiseshop
  • Newsletter
  • RSS

© 2026 JNews - Premium WordPress news & magazine theme by Jegtheme.

Aktuell

Müde Piloten am Steuer: Warum viele weiterhin trotz Erschöpfung fliegenHôtel de Silhouette erweitert sich in Biarritz um neues Gästehaus mit sechs SuitenNicaragua – neue Costanera AutobahnChile – Santiago wird AustragungsortLufthansa holt TAP: Über eine Milliarden Euro in bar geben den AusschlagAir Canada startet 2027 Direktflüge von Montréal nach Sevilla
Anzeige

Ähnliche Themen

Air Canada startet 2027 Direktflüge von Montréal nach SevillaSAS plant neue Lounge am Flughafen Kopenhagen für Juni 2027Tourismus-KI mit geprüften DestinationsdatenAir India mit verbesserten Verbindungen nach Australien und Südostasien
Anzeige

Weiterführende Links